Skip to content

Renovation and refurbishment

Older villa, tired apartment, dated office. We upgrade what is worth keeping and rebuild what is not, with the approvals and MEP work that a real renovation needs.

Starting from

From AED 120 per sq ft

Indicative. Condition of the existing property changes this significantly.

Typical timeline
4 to 16 weeks
Suited to
Villas, apartments, offices
Includes
Structural and MEP works

What we look for first

A renovation quotation is only as honest as the survey behind it. These are the things we check before pricing anything.

  • 01Wiring and distribution

    Older Dubai properties often carry undersized circuits and no RCD protection. We test before we price.

  • 02Plumbing and waterproofing

    Bathroom leaks are the most expensive surprise. We check falls, membranes and old pipework.

  • 03AC condition

    Ducting, insulation and unit age decide whether an upgrade or a replacement is the honest answer.

  • 04Structure and walls

    Which walls carry load, and what a layout change would really require.

  • 05Floor substrate

    Levels, cracking and moisture, because new flooring over a bad substrate fails within a year.

  • 06Windows and joinery

    Seals, glazing and whether existing joinery is worth keeping or should be remade.

Project images

Work delivered by our own design and site teams across Dubai and the UAE.

What this includes

Everything in this list is part of the scope and appears as its own line in your quotation.

  1. 01

    Condition survey

    What is sound, what is failing and what will cost you later if left alone.

  2. 02

    Kitchens and bathrooms

    The two rooms that carry most of a renovation's value, rebuilt properly.

  3. 03

    Layout changes

    Walls opened or added, with structural sign-off where it is required.

  4. 04

    MEP upgrades

    Old wiring, plumbing and AC replaced rather than covered over.

  5. 05

    Flooring and finishes

    Levelling, waterproofing and finishes done in the right order.

  6. 06

    Waste and permits

    Approved disposal, building permissions and NOCs handled by us.

How the programme runs

About 13 weeks end to end

  1. 01

    Survey & scope

    2 weeks

  2. 02

    Permits

    2 weeks

  3. 03

    Strip out & rebuild

    8 weeks

  4. 04

    Handover

    1 week

Watch the work

Walkthroughs, site progress and client interviews.

  • Video coming soon

    Villa renovation time-lapse

  • Video coming soon

    Kitchen renovation in four weeks

  • Video coming soon

    What we find behind old walls

  • Video coming soon

    Bathroom renovation, step by step

  • Video coming soon

    Apartment refurbishment tour

  • Video coming soon

    Client interview: a 2008 villa brought up to date

Three ways to start

Pick whichever suits you. All three reach the same team.

  • Most popular01

    Book a site visit

    We come to the property, measure it and give you a realistic range on the spot.

    Book a visit
  • 02

    Get an itemised quotation

    Send the basics and we come back with a line-by-line scope and price.

    Get an estimate
  • 03

    Download the portfolio

    Our completed work, materials and process in one PDF, if you are still comparing.

    Download brochure

Questions about this service

Do I need approval to renovate my apartment?

Usually yes. Most buildings require a fit-out NOC from the developer or owners association, and anything structural or affecting MEP needs Dubai Municipality approval. We handle both.

Can you renovate one room only?

Yes. Single kitchens and bathrooms are common projects for us, and they follow the same process, only shorter.

What if you find a problem once work starts?

We stop, photograph it, price it and get your written approval before continuing. Nothing is added to your bill without that.

Start your renovation project

Send us the basics and we will come back with a scope, a range and a realistic timeline.