Different scopes, the same drawings, the same site checklist, and the same handover standard.
Five stages. You always know which one you are in and what happens next.
The differences that matter — visible before you sign anything.
| Feature | NEXPINNACLE GLOBAL Our Standard | Local Contractor |
|---|---|---|
| Cost estimation | Itemised — every line named before you pay anything | Lump-sum or vague package pricing |
| 3D before execution | Photorealistic renders approved before work begins | Sketch or mood board only |
| Timeline commitment | Fixed date written in the contract — we hit it | Estimated, often slips by weeks |
| Point of contact | One project manager from design to handover | Multiple handoffs between teams |
| Renovation scope | Full gut-rebuild or selective upgrade, fully managed | New builds only, or limited scope |
Tell us about your space — project type, rooms, budget. Takes less than 3 minutes. Contact details at the very end.
No commitment required. Free and takes 3 minutes.
Get a Free Estimate →The same room, before the first drawing and after handover.
“They gave us a handover date in the first week and hit it. After two renovations that ran months over, that alone was worth the fee.”
“The quote had every line item on it. Nothing appeared later as an extra, which is not what I expected going in.”
“We kept using the kitchen through the whole renovation. They phased the work around us instead of asking us to move out.”
Bring a floor plan or a photo of the space – we can start the conversation right there.
Tell us what you are planning and run the numbers with the estimate tool, or talk to a designer directly.